Skip to main content
Loading

Technical Session 05: Drilling Fluids and Cementing

Tuesday, 31 March
Room 405, Level 4
Technical Session
Session Chairpersons
Lau Chee Hen, - - PETRONAS
Avinash Kumar, - - PETRONAS
  • 0900-0920 36378
    Pushing Boundaries: First And Longest Packerless Cemented Monobore Completion In Deep Deviated Wells With Complex Pressure Regimes
    M.B. Abitalhah, N. Abdul Rashid, M.S. Wardi, M. Mizan, S. Magna Bela, M. Bakar, PETRONAS; C. Lau, M. SABRI, H. Mohd Safari Lai, PETRONAS Carigali Sdn Bhd; N. Nural Azhan, Baker Hughes (Malaysia) Sdn. Bhd.; S. Tiyor, Baker Hughes
  • 0920-0940 36464
    Efficacious Application Of Managed Pressure Cementing For A Balanced Cement Plug To Mitigate 7 In. Wet Shoe: Resumed Drilling, Run & Cement 4 ½ In. Liner Using Mpc
    A. Shakhouri, Saudi Aramco D&WO; A. AlQudaihi, Weatherford Saudi Arabia; R. HAMGA, Weatherford Middle East; S. Emam, Weatherford Saudi Arabia
  • 0940-1000 36561
    Rig-less Restoration Of Wellbore Integrity Using Resin-cement System Using Coiled Tubing
    M. Dange, Halliburton Worlwide Ltd; A. Kumar, Halliburton
  • 1000-1020 36598
    Nanomaterials: A Technical Journey To Meet Depleted Field Cementing Challenges
    C. Low, Brunei Shell Petroleum; F. Xue, Yu Technologies Inc
  • Alternate 36646
    Development Of An Offline Cementing Tool For 7” Casing In Reservoir Section
    V. Limniyakul, P. Thawatthukool, P. Thongsumrit, R. Cheerajin, K. Temaismithi, PTT E&P PLC
  • Alternate 36700
    Lubricant In Synthetic Invert Emulsion Fluid Reduced Friction Factor, Vibration & Improved Rop For Complex Wells In Gulf Of Thailand
    K. Nanda Kumar, Baker Hughes; N. Wongsarnpigoon, PTTEP (thailand) Limited

OUR SPONSORS