Technical Session 05: Drilling Fluids and Cementing
Tuesday, 31 March
Room 408 - 409, Level 4
Technical Session
-
0920-0940 36378Pushing Boundaries: First And Longest Packerless Cemented Monobore Completion In Deep Deviated Wells With Complex Pressure Regimes
-
0940-1000 36464Efficacious Application Of Managed Pressure Cementing For A Balanced Cement Plug To Mitigate 7 In. Wet Shoe: Resumed Drilling, Run & Cement 4 ½ In. Liner Using Mpc
-
1000-1020 36561Rig-less Restoration Of Wellbore Integrity Using Resin-cement System Using Coiled Tubing
-
Alternate 36598Nanomaterials: A Technical Journey To Meet Depleted Field Cementing Challenges
-
Alternate 36646Development Of An Offline Cementing Tool For 7” Casing In Reservoir Section
-
Alternate 36639Optimising Drilling Performance And Wellbore Integrity Through The Integration Of Biodegradable Drilling Fluid And Foam Cement In Hpht And Narrow Margin As Extreme Condition In Deepwater
-
Alternate 36700Lubricant In Synthetic Invert Emulsion Fluid Reduced Friction Factor, Vibration & Improved Rop For Complex Wells In Gulf Of Thailand