Skip to main content
Loading

Technical Session 05: Drilling Fluids and Cementing

Tuesday, 31 March
Room 408 - 409, Level 4
Technical Session
  • 0920-0940 36378
    Pushing Boundaries: First And Longest Packerless Cemented Monobore Completion In Deep Deviated Wells With Complex Pressure Regimes
    M.B. Abitalhah, N. Abdul Rashid, M.S. Wardi, M. Mizan, S. Magna Bela, M. Bakar, PETRONAS; C. Lau, M. SABRI, H. Mohd Safari Lai, PETRONAS Carigali Sdn Bhd; N. Nural Azhan, Baker Hughes (Malaysia) Sdn. Bhd.; S. Tiyor, Baker Hughes
  • 0940-1000 36464
    Efficacious Application Of Managed Pressure Cementing For A Balanced Cement Plug To Mitigate 7 In. Wet Shoe: Resumed Drilling, Run & Cement 4 ½ In. Liner Using Mpc
    A. Shakhouri, Saudi Aramco D&WO; A. AlQudaihi, Weatherford Saudi Arabia; R. HAMGA, Weatherford Middle East; S. Emam, Weatherford Saudi Arabia
  • 1000-1020 36561
    Rig-less Restoration Of Wellbore Integrity Using Resin-cement System Using Coiled Tubing
    M. Dange, Halliburton Worlwide Ltd; A. Kumar, Halliburton
  • Alternate 36598
    Nanomaterials: A Technical Journey To Meet Depleted Field Cementing Challenges
    C. Low, Brunei Shell Petroleum; F. Xue, Yu Technologies Inc
  • Alternate 36646
    Development Of An Offline Cementing Tool For 7” Casing In Reservoir Section
    V. Limniyakul, P. Thawatthukool, P. Thongsumrit, R. Cheerajin, K. Temaismithi, PTT E&P PLC
  • Alternate 36639
    Optimising Drilling Performance And Wellbore Integrity Through The Integration Of Biodegradable Drilling Fluid And Foam Cement In Hpht And Narrow Margin As Extreme Condition In Deepwater
    M.F. Majedi, Pertamina University
  • Alternate 36700
    Lubricant In Synthetic Invert Emulsion Fluid Reduced Friction Factor, Vibration & Improved Rop For Complex Wells In Gulf Of Thailand
    K. Nanda Kumar, Baker Hughes; N. Wongsarnpigoon, PTTEP (thailand) Limited

2024 SPONSORS AND PARTNERS