Technical Session 15: Well Construction I
Wednesday, 1 April
Room 408 - 409, Level 4
Technical Session
-
0900-0920 3630720" As A Conductor And Surface Casing Up To 1,050m In Offshore Shallow Water Hpht Development Wells, Successful Case History In Mexico.
-
0920-0940 36512Buoyant Cementation System Enables Running And Rotation Of Deviated 9-5/8" Liner
-
0940-1000 36416Redefining Limits With New Global Record In 13-3/8” Non-directional Casing Drilling (NDCD)
-
1000-1020 36578Customised Conductor Collision Recovery In Brunei Shell Petroleum
-
Alternate 36363Open Hole Toe Isolation In Deepwater High Pressure High Temperature Well With An Innovative Metal Expandable Packer
-
Alternate 36721Pioneering Technologies For Efficient Liner Installation In Extreme Downhole Conditions
-
Alternate 36666Successful Implementation Of NRP (none Rotating DP Protectors/ Torque Reducers), New Technology 3D Cutters PDC Bit And Agitator To Overcome The Drilling Challenges In KSA
-
Alternate 36485Preventing Bha Failure While Drilling Through A Major Fault Zone: A Success Story In Drilling Parameter Optimization Driven By Vibration Analysis
-
Alternate 36403Hybrid Bit Solution Optimisation For Increasing Drilling Efficiency For Impact High Abrasion Tough Applications Using Advanced Simulation Modeling Technology