Technical Session 20: Well Construction II
Wednesday, 1 April
Room 405, Level 4
Technical Session
-
1100-1120 36340Enhanced Riserless Mud Recovery System with Hybrid Riser Configuration: Breaking Through Ultra-deepwater Limits
-
1120-1140 36634Wellbore Stability, Fracture Identification and Completion Optimisation in Re-entry Wells Using Image Logs: Field Approach
-
1140-1200 36666Enhancing Drilling Efficiency with Integrated Agitator, PDC with 3D Cutter, Non-Rotating Protector, and Rotary Steerable System: An Innovative Industry Practice
-
1100-1120 36319Efficiency Improvement in Deep Drilling of Archean Buried-hill Reservoirs: A Case Study from Bozhong 19-6 Gas Field





















