Technical Session 26: Well Completion
Wednesday, 1 April
Room 408 - 409, Level 4
Technical Session
-
1400-1420 36491Shunted Open Hole Gravel Pack In A Deepwater Extended Reach Drilling Well
-
1420-1440 36686A New Mechanism To Achieve Efficient Washpipe Free Advanced Inflow Control Completion Installation
-
1440-1500 36504Field-proven Success Of The Longest 9-5/8” Cased Hole Gravel Pack With Multizone Alternate Path System In A Complex Offshore Malaysian Reservoir
-
1500-1520 36548Remote Transformation From Solid Liner To Pre-drilled Liner In The Blink Of An Eye -an Innovative Breakthrough Completion Technology That Enhances Operational Excellence In Carbonate Fields By Ensuring The Highest Safety Standards And Improving Overall Project Economics
-
Alternate 36442Fracture Mechanics Analysis Of Rubber Components In Feedthrough Swellable Packers
-
Alternate 36712Barrier Rated Tubing Hanger Plug Innovation: Sharing Insights On Tangible And Intangible Value Creation Through Successful Installations While Eliminating Operational Risks
-
Alternate 36484Advanced AICD Technology For Optimising Production In High GOR Light-oil Reservoirs: A Case Study From Jasmine Field, Offshore Gulf Of Thailand
-
Alternate 36419First Field Installations Of The 9-5/8-in. Enhanced Single-trip Multi-zone Sand Control Technology In Bohai Bay, China