Technical Session 27: Pipeline, Transportation & Installation: Overcoming Technical Challenges
Wednesday, 1 April
Room 410, Level 4
Technical Session
-
Alternate 36445An Innovative Method Of Installing A Large Jacket By Integration Of Heavy Lift And Submersible Vessels
-
Alternate 36654Free Span Assessment Of Corroded Submarine Pipelines On Mobile Seabed
-
Alternate 36298Assessment Of Mechanical Interference Fit Connector (mifc) For Offshore Co₂ Pipeline Application: A Case Study From West Malaysia High Co₂ Field Development
-
Alternate 36314Design And Cost Optimisation Of Severe-sour High-Pressure High-Temperature Deepwater Pipeline
-
Alternate 36606Numerical-Experimental Correlation In Mega Offshore Float-over Installation Through Scaled Testing
-
Alternate 36597Designing And Installing 4.5inch Piggy-backed Subsea Mono-Ethylene Glycol Pipeline: A Field Experience
-
Alternate 36543The Importance Of Emergency Pipeline Repair Systems - EPRS In Safeguarding Energy Security
-
Alternate 36368Cost And Time Optimisation With Alternative Pipe Connection Method
-
Alternate 36590Confirming Integrity Of 10-inch Oil Pipeline Impinged Under A Subsea Structure - Highlighting The Impact Of Fishing Activities In South China Sea