Technical Session 44: Subsea Production Systems: Analysis, Control and Monitoring Technologies
Thursday, 2 April
Room 402, Level 4
Technical Session
-
1400-1420 36551HSSE and Cost Improvements Through the Deployment of Robotic Technology for Deepwater Underwater Inspection in-lieu of Diving
-
1420-1440 36690Enhanced Multiphase Metering at a Gas Field via Fluid Characterisation and Remote Monitoring
-
1440-1500 36553Enhancing Concept Selection Through a System Engineering Methodology via Digital Tools
-
1500-1520 36557Powering Change: Electrically Operated Subsea Safety Module for Future Well Intervention





















